Bathroom remodel in Santa Rosa, CA.

The Vallejo St. remodel involved shower and bathroom tile work, using flourish tiles my client brought back from Italy. I furnished local tiles to match the imported ones.

Vallejo St. 1

A solid foundation.

Here, we're preparing for the shower pan. Pre-sloping the shower bottom towards the drain.

 
 
IMG_6196.jpg

Water tight, sleep good at night.

The shower pan is installed on top of the pre-slope. Everything's ready for the final float.

 
 
IMG_6200.jpg

Hope floats.

Final "float" of shower floor (mortar). Next we'll do mortar on the walls, then on to the tile work.

 
 
IMG_6211.jpg

Mud, mud, and more mud.

Putting 1/2” of mortar on walls in anticipation for tile installation. Shown here is the shampoo niche.

 
 
IMG_6216.jpg

Ready to tile, makes ya smile.

At this stage, floor and walls have been mortared and we're ready for tiles.

 
 
IMG_6228.jpg

Wall-to-wall awesomeness.

Tiles installed over shower floor float. 

 
 

Finished tiles.

Completed installation.

 
 
IMG_6523.jpg

Nice Niche.

Close-up of the shampoo niche, with smaller tiles matching the shower floor.